Done:
Rip out old door frames, install prehung doors in Eila’s new room.  Done, second turned into slab door install.
Paint new doors and frames.Â
Hang new trim on new doors.
Fix Leaky Faucet
Recaulk Shower and Tub
Change Locks on bedroom doors
Replace Dryer Venting.
Christmas decorations (tree, etc.)
Moved to Phase 2:
Move furniture
Clean Gutters
Paint Eila’s new room (and pick colors).
Fix kitchen drawer that doesn’t close right
Touch-up Paint some of the window sills and trim.
Â