Week-Off Projects

Done:

Rip out old door frames, install prehung doors in Eila’s new room.  Done, second turned into slab door install.

Paint new doors and frames. 

Hang new trim on new doors.

Fix Leaky Faucet

Recaulk Shower and Tub

Change Locks on bedroom doors

Replace Dryer Venting.

Christmas decorations (tree, etc.)

Moved to Phase 2:

Move furniture

Clean Gutters

Paint Eila’s new room (and pick colors).

Fix kitchen drawer that doesn’t close right

Touch-up Paint some of the window sills and trim.

 